With the continuous development of aquaculture fisheries, intensive high-yielding aquaculture technology has been widely used, fishery farming increased significantly. In the process of aquaculture production increase, aerator has become an essential equipment to achieve high-yield fisheries intensive, plays an important role in the development of fishery economy. Reasonable use of oxygen machine can effectively increase the dissolved oxygen in the pool water, accelerate the pond water body material circulation, reduce or eliminate harmful substances, and promote plankton breeding. For the prevention and mitigation of fish floating head, to prevent flooding and improve pond water quality conditions, increase the amount of fish fed and increase yield and so have a good role in promoting.
It can be used both on freshwater and seawater.
Special design ,low speed,for baby fish |
220v,380v,440v,415v,single phase,three phase,50hz,60hz
Choose you like,please send email to me.
*The rated voltage frequency of the motor is according to the customer's requirements.
*The loading water surface given is recommended for reference,and the actual value shall be determined in accordance with local environment and unit farming density.
*Overall weight shall take the actual weight.
*Arc-shaped bevel gear box adopted in place of turbine-worm gear box is featured of energy saving and high efficiency,more than 20% less electricity than traditional model.
*Arc-shaped bevel gear is made of chrome-manganese-titanium alloy steel.designed with surface nitrocementation,and matched with reasonable hardness,featured of longer service life.
*Relying on advanced mechanical and electrical performance design,high-quality copper-enameled wire,high-grade insulation and developed production processes,the safety,reliability,efficiency and energy-saving performance of the motor have been significantly improved.
*Mechanical seal is adopted to to ensure no leakage and no pollution.
*As required bu the client,a protector is added to prevent the motor from being accidentally burned out.
*Have good water current circulation as the making of large area water wave.
*Floating boat is made of integral plastic(PE),impeller of engineering plastics,spindle and support of stainless steel,have durable service life.
Q1 What's the MOQ for your production?
A:The MOQ is 1 pcs/set
Q2 Is it all right to make customer's own brand name?
A:Yes.OEM is OK
Q3 Where is your loading port?
A:NingBo,China or else port as your request.
Q4 Are you a manufacture or trading company?
A:We are a manufacture with decades years experience in focus on designing manufacturing and exporting a wide range of aquaculture equipment.
Q5 What is your terms of packing?
A:Gearbox and motor packed by paper carton,rest plastic spare parts are without package in side container.
Q6 What is your terms of payment?
A:Normally ,its by T/T,T/T 30% as deposit ,and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.And will show loading container pictures in every detail.Also L/C is acceptable.
Q7 What is your terms of delivery?
A:EXW.FOB.CFR,CIF
Q8 How about your delivery time?
A:Generally,it will take 15-20 days after receiving your advance payment,and also depends on your quantity.
Q9 Can you produce according to the samples?
A:Yes,We can produce by your samples or technical drawings. We can build the molds and fixtures.
Q10.What is your sample policy?
A: Surely that you can get sample for testing,it'll be appreciate if you are willing to try our products,but you have to pay the sample cost and the courier cost.
Q11.Do you test all your goods before sending goods out?
A: Yes,we will test east gear box and motor before loading.Quality always is priority.we equipped with precise instrument and testing ponds for quality inspection before every time exporting.
Q12.When can I get the price?
A:We usually quote within 24 hours after we get your inquiry.If you are very urgent to get the price,please call us .
Q13.How about after-sales service?
A:1.About 1 year guarantee service.
2.English manual for installation & operation.
3.If required, we could send technicians for installation and commissioning, training.
4.Any problem, we will give solution in 12 hours.